Teak & Tide Sourcing logo TEAK & TIDESOURCING Get a quote
Home / Case study
Example case study

500 brass table lamps for a home-decor store

This is an illustrative example showing how a typical first order runs with Teak & Tide. Names and figures are examples, not a real client.

Illustrative example

The brief

A small home-decor retailer in Europe wanted 500 antique-finish brass table lamps in two designs. They had bought from India once before, but the goods arrived with a different finish from the sample and late for their season.

What we did

We shortlisted four metalware workshops in Moradabad and visited each one. Two were dropped: one did not have its own polishing unit, the other had no export experience. The buyer chose between the remaining two after seeing samples.

The first sample's finish was too bright. We took the buyer's reference photo to the workshop and a corrected sample was approved in the next round. During production we checked the electrical fittings against the buyer's market requirements and sent photos every week.

The final inspection at AQL 2.5 found a few minor scratches, which the workshop re-polished before packing. The container was loaded under our supervision and shipped FOB.

TIMELINE
  1. Week 1–2Shortlist

    4 workshops visited, 2 shortlisted, quotes compared.

  2. Week 3–5Samples

    Finish corrected once, approved on round two.

  3. Week 6–9Production

    Weekly photo updates, fittings checked.

  4. Week 10Inspection & shipping

    Minor defects fixed, AQL 2.5 passed, shipped FOB.

Result

What the buyer gained

Right finish

The bulk order matched the approved sample.

On time

Goods shipped in the planned week for the season.

Repeat partner

The buyer now reorders through the same workshop.

Ready to source from India?

Send your requirement. We reply within one business day.

Chat on WhatsApp

How are we doing?

Your rating and feedback help us serve buyers better.

★★★★★
★ Review us on Google